Passive House is a target for the building itself, not a comparison with a baseline.

Most energy compliance works by comparison: the proposed building against a baseline. Passive House works differently. It sets absolute limits on how much energy the building may need, and the design must meet them. That changes what the energy model is for, and how it is built.

The criteria

For the classic standard from the Passive House Institute, a building must meet:

The floor area used is a net "treated floor area", which is smaller than the gross area used in most codes. Results in kWh/m² are therefore not directly comparable with code figures.

How PHPP works

The Passive House Planning Package (PHPP) is a large spreadsheet. It does not simulate every hour. It calculates a monthly energy balance: heat losses through the envelope and ventilation, minus the useful part of solar and internal gains, gives the heating demand. Peak loads, cooling, summer comfort and primary energy are calculated in linked sheets.

The method is simple but the inputs are strict. Every window is entered one by one with its frame, glass, installation detail and shading. Every thermal bridge is accounted for. Ventilation heat recovery efficiency comes from certified test data.

How it differs from a code or LEED model

Where designs succeed or fail

With a 15 kWh/m² heating budget, small things become large. A balcony connection, a poorly installed window or an unshaded west facade can each use a meaningful share of the budget. The form of the building matters too: compact shapes with less envelope per unit of floor area are far easier to certify. This is why PHPP should be started at concept stage, when orientation, shape and glazing can still change.

Summer comfort needs equal attention. A very well insulated, airtight building holds heat. Shading, glazing choice and night ventilation must be designed in, and for larger or highly glazed buildings a dynamic check is sensible.

Phius in North America

In the United States many projects certify with Phius. It shares the principles but sets climate-specific targets for heating and cooling demand and loads, and it uses different modelling software. The two systems are separate, with separate criteria and certifiers. Decide which one the project is pursuing before modelling begins.

The takeaway

Passive House modeling is an energy balance held to a hard limit. Its discipline lies in careful inputs: every window, every junction, a tested air barrier and certified ventilation. Start it early, keep it updated as the design changes, and use hourly simulation alongside it where systems or summer comfort need a closer look.

Planning a Passive House or low-energy project?