A wall can have excellent insulation and still perform badly if air passes through and around it. Air leakage carries heat and moisture straight past the insulation. Unlike an R-value, it cannot be read from a drawing. It has to be measured, and the blower door test is how that is done.
How the test works
A calibrated fan is sealed into an exterior doorway. With windows and exterior doors closed, the fan lowers (or raises) the pressure inside the building to a set difference from outside, usually 50 pascals for homes and 75 pascals for commercial buildings. The airflow needed to hold that pressure equals the air leaking through the envelope. While the fan runs, leaks can be located with smoke pencils or thermal imaging.
The units
- CFM50 — airflow in cubic feet per minute at 50 Pa.
- ACH50 — air changes per hour at 50 Pa: CFM50 × 60, divided by the building volume. This is the usual residential metric in the US.
- cfm/ft² at 75 Pa — airflow divided by envelope surface area. This is the usual commercial metric, and it is fairer to large buildings than ACH.
- Air permeability, m³/(h·m²) at 50 Pa — the UK metric, also based on envelope area.
None of these is the leakage under normal conditions. Natural infiltration is far lower than the test value, because everyday wind and stack pressures are only a few pascals.
What the codes require
- US homes (IECC) — recent editions require a test, with limits of 5 ACH50 in the warmest climate zones and 3 ACH50 elsewhere.
- US commercial buildings — recent editions of the IECC and ASHRAE 90.1 set a whole-building limit of 0.40 cfm/ft² at 75 Pa, with testing or an air barrier verification programme depending on building size and edition.
- Passive House — 0.6 ACH50, one of the strictest targets in use. See our guide to Passive House modeling.
- England (Part L) — a maximum air permeability of 8 m³/(h·m²) at 50 Pa, though the design value needed to pass the overall calculation is usually much lower.
How results feed the calculations
Air leakage is an input to almost every building performance calculation.
- Load calculations — in a Manual J, infiltration is often the largest uncertain load. A tested value replaces a guess.
- Residential compliance — the test result is a mandatory item on every IECC compliance path.
- Commercial energy models — Appendix G gives a method to convert the leakage rate at 75 Pa into an infiltration rate for the simulation. The baseline uses the code value. The proposed model can use a tested or specified value.
- UK compliance — the design air permeability goes into SAP or SBEM, and the as-built test result replaces it at completion.
Getting a good result
Airtightness is achieved in design, not at the test. Name the air barrier on every detail and make it continuous across junctions: wall to roof, wall to foundation, around windows and at every penetration. Test once while the air barrier is still accessible, so leaks can be fixed cheaply. A first test after finishes are complete leaves few options.
A tighter building also needs planned ventilation. Mechanical ventilation, ideally with heat recovery, is part of the same decision.
The takeaway
The blower door turns airtightness from an assumption into a measured number. Set the target early, design a continuous air barrier, test before finishes, and carry the result into the load calculation and the energy model.
Need airtightness reflected in your model?
We turn air leakage targets and test results into correct inputs for energy models, Manual J load calculations and compliance reports. Let's talk.
Get in touchThis article is general guidance and reflects information available at the time of writing. Air leakage limits and test methods depend on the code edition and local amendments that apply to your project.