A data centre is a building built around a single load: the IT equipment. Servers, storage and network gear run around the clock and turn almost all of their electricity into heat. Everything else in the building exists to power them, keep them cool and keep them running. How much energy that "everything else" uses is the central efficiency question for data centres.
PUE: the headline metric
Power usage effectiveness (PUE) is the total energy used by the facility divided by the energy used by the IT equipment. A PUE of 2.0 means that for every kilowatt-hour reaching the servers, another kilowatt-hour goes to cooling, power conversion, lighting and other services. A PUE of 1.0 would mean no overhead at all. Modern, well-designed facilities report figures much closer to 1.0 than older ones, especially in cool climates.
PUE is useful but limited. It says nothing about how efficient the IT equipment itself is. Reducing server energy can make PUE look worse, because the fixed overheads are divided by a smaller number. PUE should also be measured over a full year, since cooling energy varies by season.
Where the non-IT power goes
- Cooling — chillers, cooling towers, pumps, computer room air handlers and fans. This is usually the largest overhead.
- Power distribution losses — transformers, uninterruptible power supplies (UPS) and power distribution units all lose some energy as heat, which then also has to be cooled.
- Lighting and building services — usually small.
ASHRAE 90.4
ASHRAE Standard 90.4, the Energy Standard for Data Centers, was written because the general building standard did not suit facilities dominated by IT load. ASHRAE 90.1 points to 90.4 for data centres above a size threshold, while smaller computer rooms remain under 90.1. Instead of PUE, 90.4 uses two components:
- Mechanical load component (MLC) — the energy used by the cooling systems relative to the IT load, compared with maximum values by climate zone.
- Electrical loss component (ELC) — the losses in the power path from the utility to the IT equipment, including UPS and distribution.
Separating the two lets a design trade within each component, and allows compliance through calculation for the facility's actual climate and design.
Cooling strategies
- Hot and cold aisle containment — separating supply and exhaust air so hot exhaust does not mix with the cold supply. This allows higher supply temperatures and lower fan energy.
- Higher supply temperatures — ASHRAE's thermal guidelines for IT equipment allow considerably warmer inlet air than older practice. Warmer air means more hours of free cooling and more efficient chillers.
- Economizers — air-side or water-side economizers provide free cooling for much of the year in many climates.
- Liquid cooling — for high-density racks, especially AI and high-performance computing, liquid delivered to the rack or chip removes heat far more effectively than air, and returns warm water that can sometimes be reused.
- Heat reuse — waste heat can supply nearby buildings or district heating, turning a cost into a resource.
Where modelling helps
The IT load is fairly constant, so the main variable is the weather. An hourly model with an appropriate weather file shows how many hours of free cooling a site will get, how chillers perform at part load, and what the annual PUE and the 90.4 components will be. It is the tool for comparing cooling options, supply temperatures and economizer types before the design is fixed. Detailed airflow in the white space, hot spots and recirculation is a separate CFD question.
Server rooms in ordinary buildings
Many office buildings, hospitals and universities contain server rooms running all year. In an energy model these are often treated wrongly, either as ordinary office space or with no cooling at all. Under Appendix G, large computer room loads can require their own baseline system. Getting them right affects both the energy result and unmet load hours.
The takeaway
Data centre efficiency comes down to how much energy is spent delivering power to the IT equipment and removing its heat. PUE measures it simply, ASHRAE 90.4 regulates it in two parts, and the biggest gains come from containment, warmer supply air, free cooling and, at high densities, liquid cooling. Model the options against the local climate before choosing.
Planning a data centre or server room?
We model cooling and electrical system options for data centres and large server rooms, including economizer hours, PUE and ASHRAE 90.4 compliance. Let's talk.
Get in touchThis article is general guidance and reflects information available at the time of writing. Data centre energy requirements depend on the edition of ASHRAE 90.1 and 90.4 or the energy code adopted in your jurisdiction, and on local rules for large electrical loads.